Example: Pile cap design.
Tweetear
Pile caps can be designed either by the truss analogy or by bending theory (see BS 8110: Part 1: 3.11.4.1(5)). In this example bending theory will be used.
For a pile cap with closely spaced piles, in addition to bending and bond stress checks, a check should be made on the local shear stress at the face of the column, and a beam shear check for shear across the width of the pile cap. For more widely spaced piles (spacing > 3 × diameter), a punching shear check should also be carried out.
Local shear check
The ultimate column load is Pu = 6400 kN.
Length of column perimeter is u = 2(400 + 400) = 1600 mm.
The shear stress at the face of the column is


Bending shear check
In accordance with BS 8110: Part 1: 3.11.4.3, shear is checked across a section 20% of the diameter of the pile (i.e. D/5) inside the face of the pile. This is section A–A in Fig. 14.30.
The shear force across this section – ignoring the self-weight of the pile cap, which is small in comparison – is given by

The corresponding shear stress is given by vu = Vu/bvd, where bv is the breadth of section for reinforcement design.
In accordance with BS 8110: Part 1: 3.11.4.4, this must not exceed (2d/av)vc where av is defined in Fig. 14.30 and vc is the design concrete shear stress from BS 8110: Part 1: Table 3.8. Thus


The necessary depth for the pile cap is
h = d + 25(diameter bar) + 75(cover)
= 846 + 100
= 946 mm ⇒use h = 950 mm
![]() |
| Fig. 14.30 Pile cap design example. |









6 comentarios:
waw complicated calculations also about pilling
Needed this, Thanks!
May i ask? Shouldn't the ult column load divided by 4 instead of 2 in the shear force calculation since the column load will be transferred to all four piles?
how you got av please describe inn details
Good day. I have a question. By referring to Figure 14.30, how do you find the av? I appreciate if you could answer my question. Thank you :)
Hi - In this example av is calculated as below:
av = (900 - 400)/2 + (600/5) = 370mm
However, this sketch appears to be wrong as minimum spacing between piles should be 3* Pile Dia. = 3*600 = 1800mm
If that was the case then av can be calculated as:
av = (2*Pile Dia. - Column width)/2 + (Pile Dia/5)